Poor Drainage Design
A court built without a graded sub-base will pool water after every summer storm, making the surface unsafe and accelerating surface cracking.
Site-Specific Slope Assessment
Drainage slope is set to a minimum 1 percent grade during base prep, calculated for the actual lot, not copied from a standard plan.